These changes respond to feedback, whilst retaining the core, substantial public benefits of the proposals. You can find out more by clicking here
We’re also hosting a public exhibition where you’ll be able to discuss the re-submission with the project team on Friday 27th March at St Josephs, 15 Lamb’s Passage, EC1Y 8LE from 3pm-7:30pm.
In response to feedback received during the statutory consultation process last year, we have carefully reviewed and revised the proposals to reduce the height and mass of the scheme, enhance the design, introduce further privacy measures and revise our proposals for dedicated, accessible cultural spaces.
The project continues to propose best-in-class grade A office floorspace, creating a flexible, sustainable workplace in the Square Mile, with complementary commercial, cultural and public uses, new and improved public realm and new public routes in and around the site.
If you weren’t able to attend the public consultation surrounding the revised proposals, please see the consultation material, which outlines the amendments to the planning application.
The western part of the proposed building has been lowered by three storeys (over 10 metres). The building will sit between the taller buildings of The Heron and Cromwell Tower and will be only three floors higher (c.15 metres) than the existing building at One Silk Street.
These changes have been designed to address objections relating to mass and bulk as well as heritage and daylight, and to generally reduce the scale and prominence of the proposal
Further details can be found here.
We have refined the façades and proposed materiality of the buildings to improve the relationship between One Silk Street and its surrounding context.
Further details can be found here.
The revisions to the height and bulk massing significantly improve the outcomes of the daylight / sunlight assessment, particularly in relation to homes in to Cromwell Tower
Further details can be found here.
Proposed terraces on the western part of the building have been removed as they were causing concern about the overlooking of neighbouring residents and new obscured glass panels have been added to parts of the façade to provide greater privacy. This is in addition to providing fins on the facade to divert sightlines and automatic blinds that will lower at dusk and mitigate against light spill.
To put the proposals within their context, the building would be 45 metres (half the length of a football pitch) from The Heron Residential Tower, 28 metres (the equivalent of up to 3 London double-decker buses) from Cromwell Tower and 24 metres (the same as 8 parked cars) from Speed House. We are therefore substantially more than 18 metres away from our neighbours; which is generally accepted as the minimum distance (based on guidance) between properties in a built-up urban environment.
Further details can be found here.
The western part of the building has been realigned to create 989sqm of enhanced public space, including a new, welcoming plaza at the Barbican Centre’s main entrance. This will increase visibility and accessibility for the cultural institutions in this unique corner of the City and provide engaging public-facing spaces for art, performance, community events and support the City of London’s Destination City initiative.
The introduction of the new Ropemaker arcade will also provide a new pedestrian route through the site, connecting the Barbican Centre to Moorgate and provide an attractive alternative for pedestrians to Silk Street.
Further details can be found here.
The revised proposals include a dedicated cultural space for live performances, that nurtures emerging talent and improves access to cultural experiences in the Square Mile. An updated façade design clearly distinguishes the venue from the commercial elements of the building and gives it a distinct cultural identity.
Complementing the cultural space will be a dedicated community space – the “Creative Community Lab” –that supports grassroots creative talent and community activity.
The entrances to both spaces are located on Ropemaker Arcade to support grassroots creative talent and community activity in a location away from residents.
Further details can be found here.
Once the building is fully vacant, we will commence soft-stripping of the internal elements of the building. We do not require planning permission for this.
As part of the original application, we also submitted a Construction Management Plan that follows the City of London’s Code of Construction Practice and outlines some of the key mitigation methods we would use during the construction of the proposed new such as working hours, deliveries, dust and noise to minimise disruption to residents.
Since then, we have continued to develop our approach to managing the construction process and further minimise potential impacts of the works. We will now implement the following measures on top of the previously submitted construction management plan:
Test:



Revised proposal


Stay up-to-date with the latests news about the project.
Disclaimer: We use ReCAPTCHA to help protect this website from spam and abuse. Any information you provide us with, should you wish to do so, will be held securely and processed in line with our privacy policy. You will only be contacted in relation to the project.